Previous image
Long Dog Lead: Professional Dog Trainer Blaze Long Lead 10 metres
Next image
Zoom image

Long Dog Lead: Professional Dog Trainer Blaze Long Lead 10 metres

Blaze Orange Gun Dog Training Long Lead. Strong polypropylene rope, approximately 10 metres long with Stainless Steel Clip.

Specifically designed for professional dog trainers for training and controlling dogs at a distance whilst allowing a certain amount of freedom and range.

Blaze orange is not visible to the dogs but helps the handler identify the lead. Round swivel end that can be attached to most collars. The handler's end is heat-sealed without a loop to enable the lead to be controlled or stepped on by the handler without risk of your foot being caught in a loop.

An essential piece of your dog-training equipment.

In stock (7 items available)
  • AUD$35.00
Qty:  
  • SKU
    10MBLLJH

Blaze Orange Gun Dog Training Long Lead. Strong polypropylene rope, approximately 10 metres long with Stainless Steel Clip.

Specifically designed for professional dog trainers for training and controlling dogs at a distance whilst allowing a certain amount of freedom and range.

Blaze orange is not visible to the dogs but helps the handler identify the lead. Round swivel end that can be attached to most collars. The handler's end is heat-sealed without a loop to enable the lead to be controlled or stepped on by the handler without risk of your foot being caught in a loop.

An essential piece of your dog-training equipment.
Specifically designed for professional dog trainers for training and controlling dogs at a distance whilst allowing a certain amount of freedom and range.
Rope is 8.2mm Thick by 10metres long with a breaking strain of 200kg
Soft handling, lightweight and UV protected Fluoro Rope

Training Lead is also available in a 20mt length. See separate sku

Lead may vary between Vinyl and Leather cover as seen in image

An essential piece of your dog-training equipment.

Customers who bought this product also bought
Drop items here to shop
Product has been added to your cart
  • Drag and drop me to the cart
    • AUD$5.50
  • Drag and drop me to the cart
    • AUD$5.50
  • Drag and drop me to the cart
    • AUD$21.00
  • Drag and drop me to the cart
    • AUD$22.00
  • Drag and drop me to the cart
    • AUD$38.00
Customers who viewed this product bought
  • Drag and drop me to the cart
    • AUD$179.00
  • Drag and drop me to the cart
    • AUD$21.00
  • Drag and drop me to the cart
    • AUD$5.50
  • Drag and drop me to the cart
    • AUD$38.00
  • Drag and drop me to the cart
    • AUD$32.00