Previous image
Long Dog Lead: Professional 10 metre Clip Dog Training Blaze Long Lead and 130cm Blaze Slip Lead Combo
Next image
Zoom image

Long Dog Lead: Professional 10 metre Clip Dog Training Blaze Long Lead and 130cm Blaze Slip Lead Combo

Blaze Orange 10mt Gun Dog Training Long Lead and Blaze Orange 130cm Slip Lead Combo.

Strong polypropylene ropes and approx 10mm thick.

The 10mt lead has been designed for all breeds of Gun Dog and has a stronger knott and clip tested to a 40kg dog.

The Slip Lead is approx 130cm long and 10mm thick with leather and Rubber fittings. 

Specifically designed for professional dog trainers for training and controlling dogs at a distance whilst allowing a certain amount of freedom and range.

Blaze orange is not visible to the dogs but helps the handler identify the lead. Round swivel end that can be attached to most collars. The handler's end is heat-sealed without a loop to enable the lead to be controlled or stepped on by the handler without risk of your foot being caught in a loop.

Essential pieces of your dog-training equipment.

You can also buy both items seperately at these links: 

130cm Blaze Orange Slip Lead

https://www.sportingoutbacksupplies.com.au/17308.html?category_id=289

10mt Blaze Orange Long Lead

https://www.sportingoutbacksupplies.com.au/long-dog-lead-professional-dog-trainer-blaze-long-lead-10-metres-with-metal-clip.html?category_id=289

 * Please note, Clip on long lead may vary from that shown

We also have a 10mt Slip Long Lead/1.3mt Slip Lead Combo which can be seen at this link:

https://www.sportingoutbacksupplies.com.au/Dog-Training-Gear/Dog-Leads-Dog-Collars/long-dog-lead-professional-10-metre-dog-training-blaze-long-slip-lead-and-150cm-blaze-dog-slip-lead-combo

 

  • AUD$66.00
Qty:  
In stock (1 item available)
    • SKU
      10MFSBLCOMBO1
Customers who bought this product also bought
Customers who viewed this product bought