Previous image
Long Dog Lead: Professional 20 metre Dog Trainer Blaze Long Lead with Metal swivel Clip
Next image
Zoom image

Long Dog Lead: Professional 20 metre Dog Trainer Blaze Long Lead with Metal swivel Clip

Blaze Orange Gun Dog Training Long Lead. Strong polypropylene rope, approximately 20 metres long and 10mm thick.

This lead has been designed for all breeds of Gun Dog and has a stronger knott and clip tested to a 40kg dog. 

Specifically designed for professional dog trainers for training and controlling dogs at a distance whilst allowing a certain amount of freedom and range.

Blaze orange is not visible to the dogs but helps the handler identify the lead. Round swivel end that can be attached to most collars. The handler's end is heat-sealed without a loop to enable the lead to be controlled or stepped on by the handler without risk of your foot being caught in a loop.

An essential piece of your dog-training equipment.

Also available in 10mt long lead.

You can also purchase the Slip Lead and 10m Long Lead-Slip Lead Combo at these links:

150cm Blaze Orange Slip Lead also available at this link:

https://www.sportingoutbacksupplies.com.au/17308.html?category_id=289

10mt long lead-Slip Lead Combo.

https://www.sportingoutbacksupplies.com.au/long-dog-lead-professional-dog-trainer-10mt-blaze-long-lead-and-150cm-blaze-dog-lead-combo.html?category_id=289

 

 

  • AUD$49.00
Out of stock
    • SKU
      20MBLLFS
Customers who bought this product also bought
Customers who viewed this product bought