Previous image
Long Dog Lead: Professional 5 metre Dog Trainer Blaze Long Lead
Next image
Zoom image

Long Dog Lead: Professional 5 metre Dog Trainer Blaze Long Lead

Blaze Orange Gun Dog Training Long Lead. Strong polypropylene rope, approximately 5 metres long.

Specifically designed for professional dog trainers for training and controlling dogs at a distance whilst allowing a certain amount of freedom and range.

Blaze orange is not visible to the dogs but helps the handler identify the lead. Round swivel end that can be attached to most collars. The handler's end is heat-sealed without a loop to enable the lead to be controlled or stepped on by the handler without risk of your foot being caught in a loop.

(Lead may vary between Vinyl and Leather cover as seen in image.
The image shows the 5mt lead and both 10mt and 20mt leads are available.

(Clip (Silver/Black and stitching colour may vary)

An essential piece of your dog-training equipment.

  • AUD$28.00
Qty:  
In stock (4 items available)
Customers who bought this product also bought
Customers who viewed this product bought