Previous image
Long Dog Lead: Professional 20 metre Dog Trainer Blaze Long Lead
Next image
Zoom image

Long Dog Lead: Professional 20 metre Dog Trainer Blaze Long Lead

Blaze Orange Gun Dog Training Long Lead. Strong polypropylene rope, approximately 20 metres long with Stainless Steel Clip and ring.

Specifically designed for professional dog trainers for training and controlling dogs at a distance whilst allowing a certain amount of freedom and range.

Blaze orange is not visible to the dogs but helps the handler identify the lead. Round swivel end that can be attached to most collars. The handler's end is heat-sealed without a loop to enable the lead to be controlled or stepped on by the handler without risk of your foot being caught in a loop.

An essential piece of your dog-training equipment.

    • 17% less
    Market price: AUD$65.00, you save AUD$11.00
  • AUD$54.00
Qty:  
In stock (2 items available)

Blaze Orange Gun Dog Training Long Lead. Strong polypropylene rope, approximately 20 metres long with Stainless Steel Clip and ring.

Specifically designed for professional dog trainers for training and controlling dogs at a distance whilst allowing a certain amount of freedom and range.

Blaze orange is not visible to the dogs but helps the handler identify the lead. Round swivel end that can be attached to most collars. The handler's end is heat-sealed without a loop to enable the lead to be controlled or stepped on by the handler without risk of your foot being caught in a loop.

An essential piece of your dog-training equipment.
Specifically designed for professional dog trainers for training and controlling dogs at a distance whilst allowing a certain amount of freedom and range.
Rope is 8.2mm Thick by 20metres long with a breaking strain of 200kg
Soft handling, lightweight and UV protected Fluoro Rope

Training Lead is also available in a 10mt length. See separate sku

Lead may vary between Vinyl and Leather cover as seen in image

An essential piece of your dog-training equipment.

    • SKU
      20MBLLJH
Customers who bought this product also bought
Customers who viewed this product bought