Previous image
Long Dog Lead: Professional 20 metre Dog Trainer Aqua Green Long Lead
Next image
Zoom image

Long Dog Lead: Professional 20 metre Dog Trainer Aqua Green Long Lead

Aqua Blue/Turquoise Gun Dog Training Long Lead.

Strong polypropylene rope, approximately 20 metres long x 8mm with Stainless Steel Silver Clip.

Stainless Steel Clip may vary in design

Specifically designed for professional dog trainers for training and controlling dogs at a distance whilst allowing a certain amount of freedom and range.

The colours are not visible to the dogs but help the handler identify the lead. Swivel end that can be attached to most collars. The handler's end is heat-sealed without a loop to enable the lead to be controlled or stepped on by the handler without risk of your foot being caught in a loop.

An essential piece of your dog-training equipment.

Also available as a 10mt and 5mt Long Lead. See seperate sku

    • 17% less
    Market price: AUD$65.00, you save AUD$11.00
  • AUD$54.00
Qty:  
In stock (3 items available)




    • SKU
      20MAQUALL
Customers who bought this product also bought
Customers who viewed this product bought