Previous image
Long Dog Lead: Professional 20mt 3-in-1 Dog Trainer Blaze Long Lead
Next image
Zoom image

Long Dog Lead: Professional 20mt 3-in-1 Dog Trainer Blaze Long Lead

3-In-1 Blaze Orange Gun Dog Training Long Lead. Strong polypropylene rope, approximately 20 metres long with Stainless Steel Clip at one end with built in wrist strap and loose Slip Lead at other end.

1. Clip Lead attachment for training the Dog when it has a collar on.

2. Handle/Wrist Strap built in to the lead near the Clip end.

3. Other end has a Slip Lead Ring for training the dog when it is not wearing a collar. (Just slip the lead over the dogs head)

Specifically designed for professional dog trainers for training and controlling dogs at a distance whilst allowing a certain amount of freedom and range.

Blaze orange is not visible to the dogs but helps the handler identify the lead. Round swivel end that can be attached to most collars. When using the Slip Lead, the handler's end has a built in wrist loop to enable the lead to be controlled.

Rope is 8.2mm Thick by 20metres long with a breaking strain of 200kg
Soft handling, lightweight and UV protected Fluoro Rope

Some of our training Leads are available in a 5mt and 10mt length. See separate sku's
Lead may vary between Vinyl and Leather cover as seen in image

An essential piece of your dog-training equipment.

  • AUD$58.00
Qty:  
In stock (2 items available)



    • SKU
      20MBO3-1
Customers who bought this product also bought
Customers who viewed this product bought