Previous image
Long Dog Lead: Professional 20 metre Dog Trainer Black/Olive Long Lead
Next image
Zoom image

Long Dog Lead: Professional 20 metre Dog Trainer Black/Olive Long Lead

Black/Olive Gun Dog Training Long Lead.

Strong polypropylene rope,

Approximately 20 metres long with Stainless Steel Clip.

Specifically designed for professional dog trainers for training and controlling dogs at a distance whilst allowing a certain amount of freedom and range.

The handler's end is heat-sealed without a loop to enable the lead to be controlled or stepped on by the handler without risk of your foot being caught in a loop.

An essential piece of your dog-training equipment.

Also available in a 10mt length. (See seperate SKU)

    • 17% less
    Market price: AUD$65.00, you save AUD$11.00
  • AUD$54.00
Out of stock
    • SKU
      20MBLOLJH
Customers who bought this product also bought