Long Dog Lead: Professional 10 metre Dog Trainer Blaze Long Lead with Heavy Duty Brass swivel Clip
Heavy Duty Brass Clip 10mt Blaze Orange Gun Dog Training Long Lead
Strong polypropylene rope, approximately 10 metres long and 10mm thick.
This lead has been designed for all breeds of Gun Dog and has a stronger knott and clip tested to a 40kg-60kg dog utilising a heavy duty Brass Clip.
Specifically designed for professional dog trainers for training and controlling dogs at a distance whilst allowing a certain amount of freedom and range.
Blaze orange is not visible to the dogs but helps the handler identify the lead. Round swivel end that can be attached to most collars. The handler's end is heat-sealed without a loop to enable the lead to be controlled or stepped on by the handler without risk of your foot being caught in a loop.
An essential piece of your dog-training equipment.
You can also purchase the Slip Lead and Long Lead-Slip Lead Combo at these links:
150cm Blaze Orange Slip Lead also available at this link:
https://www.sportingoutbacksupplies.com.au/17308.html?category_id=289
10mt long lead-Slip Lead Combo.